In a manufacturing system parts are being made at a rate of one every 6 minutes. They are two types A and B and are mixed randomly with about 10 percent of type B. A separate inspector is assigned to examine each type of parts. The inspection of a part takes a mean time of 4 minutes with a standard deviation of 2 minutes, but part B takes a mean time 20 minutes and a standard deviation of 10 minutes. Both inspectors reject about 10% of the parts they inspect. Simulate the system for total of 50 type A parts accepted and determine, idle time of inspectors and average time a part spends in system.
thapa-jeevan / event-based-modeling-of-a-manufacturing-system Goto Github PK
View Code? Open in Web Editor NEWA manufacturing system producing goods A and B, is simulated over a number of events till 50 A's are accepted.