Coder Social home page Coder Social logo

braverails / critical-path-css-rails Goto Github PK

View Code? Open in Web Editor NEW

This project forked from mudbugmedia/critical-path-css-rails

0.0 3.0 0.0 26 KB

Only load the CSS you need for the initial viewport in Rails!

License: MIT License

Ruby 14.63% JavaScript 85.37%

critical-path-css-rails's Introduction

critical-path-css-rails Code Climate

Only load the CSS you need for the initial viewport in Rails!

This gem give you the ability to load only the CSS you need on an initial page view. This gives you blazin' fast rending as there's no initial network call to grab your application's CSS.

This gem assumes that you'll load the rest of the CSS asyncronously. At the moment, the suggested way is to use the loadcss-rails gem.

This gem uses PhantomJS and Penthouse to generate the critical CSS.

Installation

Add critical-path-css-rails to your Gemfile:

gem 'critical-path-css-rails', '~> 0.2.0'

Download and install by running:

bundle install

Run the generator to install the rake task and configuration file:

rails generate critical_path_css:install

The generator adds the following files:

  • config/critical_path_css.yml
  • lib/tasks/critical_path_css.rake

Usage

First, you'll need to configue a few things in the YAML file: config/critical_path_css.yml

  • manifest_name: If you're using the asset pipeline, add the manifest name.
  • css_path: If you're not using the asset pipeline, you'll need to define the path to the application's main CSS. The gem assumes your CSS lives in RAILS_ROOT/public. If your main CSS file is in RAILS_ROOT/public/assets/main.css, you would set the variable to /assets/main.css.
  • routes: List the routes that you would like to generate the critical CSS for. (i.e. /resources, /resources/show/1, etc.)
  • base_url: Add your application's URL for the necessary environments.

Before generating the CSS, ensure that your application is running (viewable from a browser) and the main CSS file exists. Then in a separate tab, run the rake task to generate the critical CSS.

If you are using the Asset Pipeline, precompiling the assets will generate the critical CSS after the assets are precompiled.

rake assets:precompile

Else you can generate the critical CSS manually using the below task:

rake critical_path_css:generate

To load the generated critical CSS into your layout, in the head tag, insert:

<style>
  <%= CriticalPathCss.fetch(request.path) %>
</style>

A simple example using loadcss-rails looks like:

<style>
    <%= CriticalPathCss.fetch(request.path) %>
</style>
<script>
    loadCSS("<%= stylesheet_path('application') %>");
</script>
<noscript>
    <%= stylesheet_link_tag 'application', media: 'all', 'data-turbolinks-track' => true %>
</noscript>

Versions

The critical-path-css-rails gem follows these version guidelines:

patch version bump = updates to critical-path-css-rails and patch-level updates to Penthouse and PhantomJS
minor version bump = minor-level updates to critical-path-css-rails, Penthouse, and PhantomJS
major version bump = major-level updates to critical-path-css-rails, Penthouse, PhantomJS, and updates to Rails which may be backwards-incompatible

Contributing

Feel free to open an issue ticket if you find something that could be improved. A couple notes:

  • If the Penthouse.js script is outdated (i.e. maybe a new version of Penthouse.js was released yesterday), feel free to open an issue and prod us to get that thing updated. However, for security reasons, we won't be accepting pull requests with updated Penthouse.js script.

Copyright Mudbug Media and Michael Misshore, released under the MIT License.

Recommend Projects

  • React photo React

    A declarative, efficient, and flexible JavaScript library for building user interfaces.

  • Vue.js photo Vue.js

    ๐Ÿ–– Vue.js is a progressive, incrementally-adoptable JavaScript framework for building UI on the web.

  • Typescript photo Typescript

    TypeScript is a superset of JavaScript that compiles to clean JavaScript output.

  • TensorFlow photo TensorFlow

    An Open Source Machine Learning Framework for Everyone

  • Django photo Django

    The Web framework for perfectionists with deadlines.

  • D3 photo D3

    Bring data to life with SVG, Canvas and HTML. ๐Ÿ“Š๐Ÿ“ˆ๐ŸŽ‰

Recommend Topics

  • javascript

    JavaScript (JS) is a lightweight interpreted programming language with first-class functions.

  • web

    Some thing interesting about web. New door for the world.

  • server

    A server is a program made to process requests and deliver data to clients.

  • Machine learning

    Machine learning is a way of modeling and interpreting data that allows a piece of software to respond intelligently.

  • Game

    Some thing interesting about game, make everyone happy.

Recommend Org

  • Facebook photo Facebook

    We are working to build community through open source technology. NB: members must have two-factor auth.

  • Microsoft photo Microsoft

    Open source projects and samples from Microsoft.

  • Google photo Google

    Google โค๏ธ Open Source for everyone.

  • D3 photo D3

    Data-Driven Documents codes.