gantt's Introduction

Clojure wrapper for PlantUML Gantt

Demo plan

Quick Intro

This program (named gantt) is based on PlantUML v1.2022.5.

Program gantt uses some subset of PlantUML Gantt syntax to describe a project, its structure, and progress.

Program gantt transforms: EDN dataSVG/PNG picture without any external dependencies. Also, it produces intermediate puml-file for every picture.

To produce the picture above the following command was used:

java -Duser.language=en -Djava.awt.headless=true -jar gantt.jar -f svg -i ./doc -o :input-folder generate

Click here to see EDN source for the picture above using EDN format.
Click here to see intermediate PUML file produced from EDN.

Download

Download the latest version of the gantt program: https://github.com/redstarssystems/gantt/releases/

Motivation

Planning in software development is an important part of communications with managers and teams.

Visualization of the project progress makes communications with managers and the team more productive.

Manual drawing of the project progress is very time expensive.

External Gantt tools are not always convenient for the whole team, not accessible for managers or not accessible from a secured environment, and demand context switching and learning.

Any language which has a syntax based on unstructured data promotes a huge number of errors which is not easy to find.

As an engineer I want:
  • to have a detailed plan for every big feature developed by several teams in parallel;

  • to have a structured data language to describe project structure, task dependencies, resource allocation, and progress;

  • to quickly visualize the whole project and its progress;

  • to work only in my IDE and update data of the project;

  • that any team member can read and update data of the project using their favorite IDE;

  • that any program can read and update data of the project (make project data machine-readable);

  • to reproduce project progress in the past based on data using git;

  • that CI/CD tools can convert data to SVG/PNG picture with current project progress and publish it to any location;

  • automatically update asciidoc documents with a picture of actual project progress.

Usage

$ java -jar gantt.jar --help
Gantt diagram generator.

Usage: program-name [options] action

Options:
  -p, --port PORT             8080       HTTP server port number
  -s, --server HOST           localhost  start HTTP server using this hostname
  -i, --input-folder FOLDER              Input folder with EDN-files
  -f, --file-format FORMAT    png        PNG or SVG format for output files
  -o, --output-folder FOLDER             Output folder to write Gantt diagrams. Use value `:input-folder` to put result in the input folder.
      --delete-puml                      Delete intermediate `puml` file
  -h, --help

Actions:
  server   Start HTTP server to show generated Gantt diagrams via HTTP
  watch    Run watchdog for input folder changes to produce Gantt diagrams to output folder
  generate Generate Gantt diagrams from input folder to output folder and exit

Please refer to the manual page https://github.com/redstarssystems/gantt for more information.

Generate mode

This mode is activated by generate action and may be used in scripts.

The program will scan the input folder and all its subfolders for EDN files. gantt will generate PNG/SVG pictures and save them to the output folder and exit.

The parameter --output-folder may have a special value :input-folder which means that PNG/SVG pictures should be saved in the same folder where EDN-file was found.

Example:

$ java -Djava.awt.headless=true -jar gantt.jar -f svg -i ./doc -o :input-folder generate

-Djava.awt.headless=true is used to prevent loss of focus in other programs.

Watchdog mode

This mode is activated by the watch action and starts a long-running process.

This mode is useful if you want to update PNG/SVG pictures automatically when any EDN-file is added or changed.

The program will catch any create or update file-system event for EDN-files in the input folder and all its subfolders.

$ java -Djava.awt.headless=true -jar gantt.jar -f png -i /Users/mike/projects/gantt/doc -o :input-folder watch
Starting watchdog for folder: /Users/mike/projects/gantt/doc
Press <Enter> to exit.

-Djava.awt.headless=true is used to prevent loss of focus in other programs.

Server mode

This mode is activated by server action and starts two long-running processes. First process – watchdog mode is running to automatically update pictures. Second process – web server which is expose PNG/SVG files as static resources from output-folder. All other filetypes are filtered and never exposed via web.

java -Duser.language=en -Djava.awt.headless=true -jar target/gantt-0.1.8-standalone.jar -f svg -i /Users/mike/projects/planning -o :input-folder --delete-puml server  -s 0.0.0.0

Starting watchdog for folder: /Users/mike/projects/planning
Running web server on address 0.0.0.0 and port 8080
Serving /Users/mike/projects/planning folder. Use it as root path to access image files.
Press <Enter> to stop watching.
Press <Ctrl-C> to exit

Syntax

To describe project structure and its progress use EDN-file with one global map.

Inside this map, you may use all flags described in this section.

Example 1

Example of the project with one task:

{:project-title   "Title1"
 :project-header  "Header1"

 :project-scale   :daily

 :project-content [{:task             "Task1"
                    :alias            :t1
                    :days-lasts       10
                    :percent-complete 20}]
}

This will produce the following picture:

01

Project Title

To set project title use:

{:project-title   "Title1"}

Project Header

To set project header use:

{:project-header  "Header1"}

To set project footer use:

{:project-footer  "Footer1"}

Project scale

To set appropriate project scale:

{:project-scale  :daily}

Possible values are: :daily :monthly :weekly :quarterly :yearly

Example:
zoom

Also, the project scale may be set with zoom:

{:project-scale-zoom  {:scale :daily
                       :zoom   2}}

This will produce the following effect:

zoom

Image size

To control output PNG/SVG image size use:

{:scale           "1200*900"}

Disable/Enable footbox

This flag can enable/disable duplication of days in a footbox.

{:hide-footbox?   true}

Example 2

{:scale           "320*180"
 :project-scale   :daily
 :project-title   "Title1"
 :project-header  "Header1"
 :project-footer  "Footer1"
 :hide-footbox?   true

 :project-content [{:task             "Task1"
                    :alias            :t1
                    :days-lasts       10
                    :percent-complete 20}]}

This will produce the following picture:

02

Project start date

Without project start date the gantt will numerate days in increasing order.

When the project start date is set the gantt will display a calendar depending on :project-scale value.

To set project start date use:

{:project-starts     "2021-05-27"}

Example:

start date

Locale & Calendar

If you want to change locale to Russian then just add:

:inline-text-begin "language ru"

You can choose the language of the Gantt calendar, with the language <xx> command where <xx> is the ISO 639 code of the language. By default, gantt will take locale from the operating system (default JVM locale).

Colors

The colors in various places in gantt may be set in several notations as String values:

  1. Simple names. Examples: "green", "fuchsia"

  2. Complex names. Example: "GreenYellow/Red"

  3. Hex values. Example: "#FF0000/FFFF00"

Tasks colors

To set colors for all tasks in the project use the flag:

{ :tasks-colors    {:color/in-progress "GreenYellow/Red"
                    :color/completed   "GreenYellow/Green"}}

It is possible to set particular color for the individual task using :color flag inside a task:

{
:project-content [{:task             "task3"
                    :alias            :t3
                    :days-lasts       10
                    :percent-complete 0
                    :starts-after     :t2
                    :color            "Gold/Black"}]
}

Days colors

To set colors for a particular day in the project use this flag:

{ :days-colors     [{:color     "GreenYellow/Green"
                   :days-list ["2021-06-02" "2021-06-08"]}] }

To set colors for days range in the project use this flag:

{ :days-colors     [{:color      "salmon"
                    :days-range {:days-name "out of office" ;; optional field
                                 :from      "2021-06-04"
                                 :to        "2021-06-06"}}]}

Examples:

colored named days

Holidays

To set holidays inside the project use flag :holidays:

{ :holidays        ["2021-05-03" "2021-05-10"]}

Closed days

To set days of week closed for work use flag :closed-days:

{ :closed-days     #{:saturday :sunday}}

Possible values are: :sunday :monday :tuesday :wednesday :thursday :friday :saturday

Highlight today

To highlight today use flag :today:

{ :today       {:days-after-start 10 :color "#AAF"}}

or

{ :today       {:date "2022-07-28" :color "#AAF"}}

or

{ :today       {:color "#AAF"}} ;; will be set to (LocalDate/now) value

Milestones

Milestone is an important point for the project.

Milestones can be set in section :milestones:

{
:milestones      [{:milestone     "m1"
                    :happens-after [:t1]}  ;; relative milestone (after task :t1)

                   {:milestone  "m3"
                    :happens-at "2021-05-20"}] ;; absolute milestone
}

Also, milestones can be set between tasks:

{:project-content [{:task             "task2"
                    :alias            :t2
                    :days-lasts       10
                    :percent-complete 34
                    :starts-after     :t1}

                   {:task             "task3"
                    :alias            :t3
                    :starts-at        "2021-05-06"
                    :ends-at          "2021-05-18"
                    :percent-complete 0}

                   {:milestone     "Milestone 1"
                    :happens-after [:t2 :t3]}        ;; relative milestone

                   {:milestone  "Milestone 2"
                    :happens-at "2021-05-20"}]}      ;; absolute milestone

Separator

A separator is a horizontal line with some description:

{:project-content [{:separator "Stage1"}]}

Inline text at the beginning

Inline text to set custom Plantuml values. Text will be added at the beginning of the puml-file:

{:inline-text-begin  "<style>
ganttDiagram {
  task {
    BackGroundColor GreenYellow
    LineColor Green
    unstarted {
      BackGroundColor Fuchsia
      LineColor FireBrick
    }
  }
}
</style>"}

Inline text to the end

Inline text to set custom Plantuml values. Text will be added to the end of the puml-file:

{:inline-text-end  "[learn-clojure-site] links to [[http://www.clojure.org]]"}

Tasks

The tasks should be described in section :project-content

{:project-content [
                   ;; put tasks, milestones, separators here
                  ]}

Task spec:

[:map
         [:task task-name]
         [:alias task-alias]
         [:links-to {:optional true} task-links-to]
         [:percent-complete task-percent-complete]
         [:color {:optional true} color]
         [:resources {:optional true} [:vector {:gen/min 1, :gen/max 3} task-resource]]
         [:pause-on-days {:optional true} [:vector {:gen/min 1, :gen/max 3} string-date]]
         [:starts-at {:optional true} task-starts-at]
         [:starts-before-end {:optional true} task-starts-before-end]
         [:starts-after-end {:optional true} task-starts-after-end]
         [:ends-at-start {:optional true} task-ends-at-start]
         [:ends-at-end {:optional true} task-ends-at-end]
         [:days-lasts {:optional true} task-days-lasts]
         [:ends-at {:optional true} task-ends-at]
         [:starts-after {:optional true} task-starts-after]]

Task Resources

Resources can be defined inside every task using :resources vector of Strings.
Every string in a vector is a named resource.
By default, every resource is occupied 100% for the task.
If you need to specify a particular percent for the resource for this task then after resource name put : and amount of percent.

{
 :project-starts  "2021-06-01"
 :project-scale   :daily

 :project-content [{:task             "Task1"
                    :alias            :t1
                    :starts-at        "2021-06-01"
                    :days-lasts       6
                    :resources        ["Mike" "Olga:50%"]
                    :percent-complete 20}

                   {:task             "Task2"
                    :alias            :t2
                    :starts-after     :t1
                    :days-lasts       8
                    :resources        ["Olga:50%"]
                    :percent-complete 20}]

 }

This will produce the following picture:

resources

Task URL

A task may have a clickable URL (e.g. Jira task) when generating SVG file. To set clickable URL use :links-to property and string URL as a value.

{
 :project-content [{:task             "Learn Clojure.org"
                    :alias            :learn-clojure-site
                    :starts-at        "2021-06-01"
                    :ends-at          "2021-06-04"
                    :links-to         "http://www.clojure.org"
                    :percent-complete 100}]
}

You can use SVG in asciidoc file to make URL clickable from *.adoc file.

image:target/test-data/programming-clojure-plan.edn.svg[opts=interactive]

'or

image:target/test-data/programming-clojure-plan.edn.svg[Clojure plan, 900,opts=inline]

Fixed start

A task may have a fixed start on a particular day. To set fixed start date use :starts-at property and string date as a value.

{
 :project-content [{:task             "Task1"
                    :alias            :t1
                    :starts-at        "2021-06-01"  ;; fixed start date
                    :days-lasts       6
                    :percent-complete 20}]
}

Relative start

A task may have a relative start. To set relative start use :starts-after property with task alias as a value.
This means that this task will start after other task ends.

{
 :project-content [{:task             "Task2"
                    :alias            :t2
                    :starts-after     :t1 ;; Task2 starts after task :t1 ends
                    :days-lasts       8
                    :percent-complete 20}]
}

A task may have another relative start: start before N days another task ends. To set this relative start use :starts-before-end property with vector with two values.
First value is task alias, second value is a number of days before this task alias end.

{
 :project-content [{:task              "task5"
                    :alias             :t5
                    :days-lasts        10
                    :percent-complete  0
                    :starts-before-end [:t2 3]}]  ;; task :t5 starts before 3 days :t2 ends
}

A task may have another relative start: start after N days after another task ends. To set this relative start use :starts-after-end property with a vector with two values.
The first value is task alias, the second value is the number of days after this task alias end.

{
 :project-content [{:task             "task6"
                    :alias            :t6
                    :days-lasts       15
                    :percent-complete 0
                    :starts-after-end [:t1 3]}]  ;; task :t6 starts after 3 days after :t1 ends
}

Fixed end

A task may have a fixed end date on a particular day. To set fixed end date use :ends-at property and string date as a value.

{
 :project-content [{:task             "Task1"
                    :alias            :t1
                    :starts-at        "2021-06-01"  ;; fixed start date
                    :ends-at          "2021-06-05"  ;; fixed end date
                    :percent-complete 20}]
}

Relative end

A task may have relative end: this task ends at the same time as another task ends. To set this relative end use :ends-at-end property with task alias as a value.

{
 :project-content [{:task              "task5"
                    :alias             :t5
                    :days-lasts        10
                    :percent-complete  0
                    :ends-at-end :t2}]  ;; :t5 ends when :t2 ends
}

A task may have relative end: this task ends when another task starts. To set this relative end use :ends-at-start property with task alias as a value.

{
 :project-content [{:task              "task5"
                    :alias             :t5
                    :days-lasts        10
                    :percent-complete  0
                    :ends-at-start :t8}]  ;; :t5 ends when :t8 starts
}

Task pause

A task may be paused on particular days using :pause-on-days

{
 :project-starts  "2021-06-01"
 :project-scale   :daily

 :project-content [{:task             "Task1"
                    :alias            :t1
                    :pause-on-days    ["2021-06-03" "2021-06-04"]
                    :starts-at        "2021-06-01"
                    :days-lasts       6
                    :percent-complete 20}

                   {:task             "Task2"
                    :alias            :t2
                    :starts-after     :t1
                    :days-lasts       8
                    :percent-complete 20}]

 }

This will produce the following picture:

pause task

Examples

Sprint Plan template

If you have git you can put EDN-file with the Sprint plan and share it with your team.
Any team member can update task progress.
CI/CD tools, using gantt, can generate PNG/SVG picture with a Sprint progress, and publish it on dashboard.

{
 :scale              "1900*1300"                            ;; picture size

 :project-title      "Sprint № "                            ;; sprint number
 :project-header     "Status: future"                       ;; status: future or completed
 :project-starts     "2021-05-31"                           ;; sprint start date
 :project-scale-zoom {:scale :daily :zoom 3}

 :tasks-colors       {:color/in-progress "GreenYellow/Red"
                      :color/completed   "GreenYellow/Green"}

 :closed-days        #{:saturday :sunday}                   ;; weekends
 :holidays           ["2021-06-14"]                         ;; holidays

 :hide-footbox?      true                                   ;; hide calendar at the bottom

 :project-content    [
                      ;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;
                      {:separator "Analytics"}

                      {:task             "Task 1"
                       :alias            :t1
                       :resources        ["Name1" "Name2:50%"]
                       :starts-at        "2021-06-01"
                       :ends-at          "2021-06-04"
                       ;; :color            "Red/Red"       ;; uncomment at the end of a sprint if task is not completed
                       :percent-complete 0}

                      {:task             "Task 2"
                       :alias            :t2
                       :resources        ["Name3"]
                       :starts-after     :t1
                       :days-lasts       4
                       ;; :color            "Red/Red"       ;; uncomment at the end of a sprint if task is not completed
                       :percent-complete 0}
                      ;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;
                      {:separator "Development"}

                      {:task             "Task 3"
                       :alias            :t3
                       :resources        ["Name3" "Name4:50%"]
                       :starts-at        "2021-06-01"
                       :ends-at          "2021-06-04"
                       ;; :color            "Red/Red"        ;; uncomment at the end of a sprint if task is not completed
                       :percent-complete 0}

                      {:task             "Task 4"
                       :alias            :t4
                       :resources        ["Name5"]
                       :starts-after     :t3
                       :days-lasts       4
                       ;; :color            "Red/Red"      ;; uncomment at the end of a sprint if task is not completed
                       :percent-complete 0}

                      ;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;
                      {:separator "QA Testing & Release"}

                      {:task             "Task5 5"
                       :alias            :t5
                       :resources        ["Name7" "Name8:50%"]
                       :starts-at        "2021-06-01"
                       :ends-at          "2021-06-04"
                       ;; :color            "Red/Red"       ;; uncomment at the end of a sprint if task is not completed
                       :percent-complete 0}

                      {:task             "Task 6"
                       :alias            :t6
                       :resources        ["Name9"]
                       :starts-after     :t5
                       :days-lasts       4
                       ;; :color            "Red/Red"       ;; uncomment at the end of a sprint if task is not completed
                       :percent-complete 0}

                      {:milestone     "Release date"
                       :happens-after [:t5 :t6]}
                      ]
 }

This will produce the following picture:

reverse order

Planning with reverse order

The main idea is to put the first task as a whole project with a fixed end date or duration.
Then create project subtasks after the first task using :ends-at-start and :ends-at-end flags to control their end.

{
 :project-scale   :daily

 :project-content [{:task             "whole project"
                    :alias            :t5
                    :days-lasts       30
                    :percent-complete 0
                    :color            "Gray"}

                   {:task             "task4"
                    :alias            :t4
                    :days-lasts       4
                    :percent-complete 0
                    :ends-at-end      :t5}

                   {:task             "task3"
                    :alias            :t3
                    :days-lasts       4
                    :percent-complete 0
                    :ends-at-start    :t4}

                   {:milestone     "m2"
                    :happens-after [:t3]}

                   {:task             "task2"
                    :alias            :t2
                    :days-lasts       12
                    :percent-complete 0
                    :ends-at-start    :t3}

                   {:task             "task1"
                    :alias            :t1
                    :days-lasts       10
                    :percent-complete 0
                    :ends-at-start    :t2}

                   {:milestone     "m1"
                    :happens-after [:t1]}]
 }

This will produce the following picture:

reverse order

Build this project

Project gantt generated from Application template.

Install project prerequisites

All these tools you need to install only once.

  1. Install clojure deps cli tools

    1. MacOS

      brew install clojure/tools/clojure
    2. Linux

      Ensure that the following dependencies are installed in OS: bash, curl, rlwrap, and Java.

      curl -O https://download.clojure.org/install/linux-install-1.10.3.822.sh
      chmod +x linux-install-1.10.3.822.sh
      sudo ./linux-install-1.10.3.822.sh
  2. Install latest clj-new library to a file ~/.clojure/deps.edn

    {
     :aliases {
               :new     {:extra-deps {seancorfield/clj-new {:mvn/version "1.1.297"}}
                         :exec-fn    clj-new/create}
              }
     }
  3. Install babashka

    1. MacOS

      brew install borkdude/brew/babashka
    2. Linux

      sudo bash < <(curl -s https://raw.githubusercontent.com/babashka/babashka/master/install)
  4. Run once:

    just requirements

to install other necessary tools (MacOS only, for Linux manual instruction).

Project workflow

To build distributive run: bb build

To configure project workflow scripts use bb.edn.

To configure the project version use file project-version.

To configure group-id and artifact-id for jar file use file project-config.

To configure secrets & passwords use file project-secrets.edn.

Run bb tasks to show help for project workflow.

List of available tasks:

clean        Clean target folder
build        Build application for this project (standalone uberjar file)
install      Install application uberjar file locally (requires the pom.xml file)
deploy       Deploy this application
run          Run application
repl         Run Clojure repl
outdated     Check for outdated dependencies
bump         Bump version artifact in `project-version` file, level may be one of: major, minor, patch, alpha, beta, rc, release.
test         Run tests
format       Format source code
lint         Lint source code
javac        Compile java sources (if any)
jar          Build thin jar file for this application
standalone   Create a standalone application with bundled JDK (using jlink, JDK 9+)
requirements Install project requirements

License

This work is dual-licensed under Eclipse Public License 2.0 and GPL 3.0.
PlantUML and java sources in java/src are under GPL 3.0. © Copyright 2009-2020, Arnaud Roques

The rest of the program is under EPL 2.0. Copyright © 2021 Mikhail Ananev
You can choose between one of them if you use this work.

SPDX-License-Identifier: EPL-2.0 OR GPL-3.0-or-later

gantt's People

Contributors

mikeananev avatar

Watchers

James Cloos avatar  avatar

Recommend Projects

  • React photo React

    A declarative, efficient, and flexible JavaScript library for building user interfaces.

  • Vue.js photo Vue.js

    🖖 Vue.js is a progressive, incrementally-adoptable JavaScript framework for building UI on the web.

  • Typescript photo Typescript

    TypeScript is a superset of JavaScript that compiles to clean JavaScript output.

  • TensorFlow photo TensorFlow

    An Open Source Machine Learning Framework for Everyone

  • Django photo Django

    The Web framework for perfectionists with deadlines.

  • D3 photo D3

    Bring data to life with SVG, Canvas and HTML. 📊📈🎉

Recommend Topics

  • javascript

    JavaScript (JS) is a lightweight interpreted programming language with first-class functions.

  • web

    Some thing interesting about web. New door for the world.

  • server

    A server is a program made to process requests and deliver data to clients.

  • Machine learning

    Machine learning is a way of modeling and interpreting data that allows a piece of software to respond intelligently.

  • Game

    Some thing interesting about game, make everyone happy.

Recommend Org

  • Facebook photo Facebook

    We are working to build community through open source technology. NB: members must have two-factor auth.

  • Microsoft photo Microsoft

    Open source projects and samples from Microsoft.

  • Google photo Google

    Google ❤️ Open Source for everyone.

  • D3 photo D3

    Data-Driven Documents codes.